Well_Flow Process Flow
Build Status
| Module | Status |
|---|---|
| Login / Security (shared with FOAM) | Ready |
| Job_Template (Phase 1) | Ready |
| Stage_Reporting (Phase 2) | Shell |
| Post_Job / Job_Ticket / QC | Phase 2 |
| Well_Flow_SUM / Invoicing | Planned |
Job_Template
Create the master job setup that feeds all downstream modules.
Phase 1 • ReadyStage_Reporting
Capture stage-level operational and product usage inputs.
Phase 2 • ShellWell_Flow_SUM
Totalize product usage and financials for invoicing.
PlannedJob_Template Setup
Job_Template Purpose
| No job templates yet. |
Active Jobs
| Job # | Customer | Pad | Wells | Fleet | Status | Stages | Actions |
|---|---|---|---|---|---|---|---|
| No jobs yet. Create one in Job_Template. | |||||||
Stage_Reporting
Multiple files combine into one stage (e.g. shutdown for weather / electronics).
Parsed From WITSML
Reported Stages
| Job | Well | Stage | Status | Charts | Actions |
|---|---|---|---|---|---|
| No stages reported yet. | |||||
Audit_Center
| Job | Well | Stage | Reports | Audit | Actions |
|---|---|---|---|---|---|
| No approved stages to audit yet. Approve a stage in Stage_Reporting to send it here. | |||||
The technical specialist reconciles each stage's Post Frac Report and Job Ticket against the FOAM Job Log, then signs off. Only audited stages advance to Post_Job.
Audit Workspace
Post_Job Center
QC Center — Reconciliation
| Job | Well | Stage | Proppant Δ | Chem Δ (worst) | QC Result | Signed | Actions |
|---|---|---|---|---|---|---|---|
| No stages to reconcile yet. | |||||||
QC compares Design (plan) → Metered (WITSML) → Actual (treater). A stage flags when Actual differs from Metered or Design by more than the tolerance. Sign off to lock QC.
Well Flow Product SUM — On-Location Inventory
Inventory On Hand
BOL deliveries credit inventory; each well's approved usage debits it. On Hand = Delivered − Used, per product (names from the Job Template).
| Product | Category | Delivered (BOL) | Used by Wells | On Hand | Unit |
|---|---|---|---|---|---|
| Select a pad to view inventory. | |||||
Record BOL Delivery
| Date | BOL # | Product | Delivered | Doc | |
|---|---|---|---|---|---|
| No BOL deliveries recorded for this pad yet. | |||||
Proppant reconciles in the product's unit (ton/lb/MT/sacks are converted automatically); chemicals/acids reconcile in gallons (bbl converts at 42 gal/bbl).
Well Flow Invoice Rollup
| Job | Well | Stages | Proppant (ton) | Service $ | Product $ | Total $ | Actions |
|---|---|---|---|---|---|---|---|
| No approved stages yet. Approve stages in Stage Reporting to totalize them here. | |||||||
Totalizes only approved stages. Each well is invoiced individually; financials mirror the Job Ticket (service always billed, products billed when enabled on the template). Product inventory now lives in Well Flow Product SUM.
Invoice Queue
| Invoice # | Customer | Well | Stages | Total | Status | Updated | Actions |
|---|---|---|---|---|---|---|---|
| No invoiceable wells yet. Approve stages in Stage Reporting to populate the queue. | |||||||
One invoice per well. Status moves Draft → Sent → Paid. Totals mirror Well_Flow_SUM and the Job Tickets (service always; products when enabled). Marking an invoice Sent locks in the amount at that moment.